Everyone's talking about AI data center power
But tens of watts per module evaporate
in the last inch between the GPU socket and the die
and that part gets less coverage
P = I²R
A middle-school equation
quietly defining million-GPU AI factories
Vicor ($VICR) has spent 30 years
building the most refined answer to it
They lost the H100 socket to MPWR
In CPO, the criteria shift
Why they shift
How space and thermal inside a CPO package
force power delivery architecture
Wrote it up as shown the quoted article