It’s about time to deployment. DG can do so much more with small regulatory tweaks. What if every industrial backup gen could run just 100 hrs a year (diesel and nat gas). Net metering for all. The short term is the challenge
Mar 21
at
9:10 PM
Relevant people
Log in or sign up
Join the most interesting and insightful discussions.